Shacman 6X4 Tractor Truck Towing Tractor Head for Africa
1. GENUINE ORIGINAL QUALITY
2. GOOD AFTER-SALES SERVICE
3.PROFESSIONAL AND STABLE PARTS SUPPLY
4. DELIVERY WITHIN 10 DAYS AFTER CONFIRM DETAILS
(Configurations can be changed)
X3000 extended high roof cab with top side deflector (middle storage box)-lightweight version of daily industrial goods transport tractor / pearl molybdenum red (metallic paint) /WP12.460E50/12JSDX220TA-B / MAN 7.3t tray Maintenance-free front axle/13T MAN single-stage reduction axle-3.7/full vehicle aluminum alloy wheels, aluminum rims, aluminum alloy drive shaft/750L frame/lightweight aircraft beam/DC air filter/aluminum water tank/normal exhaust/front 2 pieces rear 2 leaf spring suspension/12R22.5 low rolling resistance tires/multifunctional steering wheel (with cruise control)/(940-850)×270(single 8)/700L aluminum alloy fuel tank/ domestic four-channel ABS/day Xingjian Zhixing Edition / 330Ah maintenance-free battery / electronically controlled automatic constant temperature air conditioning / electric flip / three-stage car pedal / glass fiber reinforced plastic bumper / three-stage integral fender / left front traction pin / Yost 50 saddle / electric shaker Window machine/central control lock (with remote control)/
Our Factory
SINOTRUK has an annual output of 180, 000 vehicles and 200, 000 engines capacity.
Main products:
Our main Overseas Business Scope
- All types of brand new and used heavy duty truck and light duty trucks
- Special modified vehicle
- All types of semitrailer
- Construction equipment&Machinery
- Pickup, VAN, Bus
- Spare parts- Service & Maintenance
Our shipping and delivery
Warranty
(1) One year quality guarantee or within 100000km, which comes the first.
(2) Other spare part could be supplied by OEM at cost prices.
(3) Regularly callback to know the vehicle's working status.
(4) The overseas engineers are always ready to deal with unexpected needs.
FAQ
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |