Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 1 Year or 60, 000 Kilometers |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Specifications | |
Model number | CTIL9380 |
Rated Load | 40000 kg |
Tare Weight | 8000 kg |
Wheel Base | 7180+1310+1310(mm) |
Tyre Specifications | 1100R20/1200r20 |
No. Of the Tyres | 12 |
No. Of the Axles | 3 |
Axle-load | 23500 kg |
King Pin | 50#/90# |
Landing Leg | 28ton |
Pieces of leaf-spring | 10 |
Suspension | Independent stamping steel rigid suspension ( air suspension) |
Departure Angle | 14.5 |
Front/Rear Overhang | 2100 mm |
Outside Dimensions (LxWxH) | 13000X2500X2990 (mm) |
Interior Dimensions (LxWxH) | 12820X2350X600 (mm) |
Brake System | Dual line braking system/ABS |
Brake Air Chamber | Six double chamber |
Electrical | 24V 7 ways(7 wire harness) |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |