Customization: | Available |
---|---|
After-sales Service: | Free Accessories |
Warranty: | 12 Months or 100000km Which Comes First |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material: Tank: Test pressure: Work pressure: |
• low-alloy steel 09G2S (P355NL), 12mm thickness; • 50 m3; • 2,3 MPa; • 1,6 MPa. |
|
Suspension:
|
• 3 FUWA or BPW axles, pneumatic suspension EVL; • axles load capacity 3x 16 000 kg, one tire for wheel; • drum brakes 420x180mm; |
|
Valves: |
• pneumatic bottom valve Fisher, DN80; • pneumatic bottom valve Fisher, DN50; • pneumatic bottom valve Fisher, DN50;
• unloading ball valves Genebre, DN80; • unloading ball valves Genebre, DN40; • unloading ball valves Genebre, DN40; |
|
Safety valves |
• Rego 3". |
|
Landing lag: |
• Telescopic, double-speed, 24 ton of static load BPW (Germany) |
|
King pin: |
• demountable2", GeorgeFisher(Germany). |
|
Brake system:
|
• Wabco (Germany); • ABS - 2S/2M; • EBS; • parking brake drive from pneumatic accumulators on 2 axles; |
|
Wheels: |
• tires dimension 12.00-20 Radial |
|
Electric equipment:
|
• ADR performance, 24V, Aspock (Austria); • rear multifunctional lamps - 2 pc; • side overall lamps with reflectors - 8 pc; • backlight of numberplate - 2 pc; • front overall lamps with deflectors - 2 pc; • backlight of technological box - 1 pc; |
|
Painting: |
• grit blasting, grounding; • white painting; • logotypes of the Customer; |
|
Equipment: |
• fire extinguisher 6kg in plastic case - 2 pc; • grounding circuit (coil with cable 15m, 4 grounding points on the body; • winch of spare wheel - 1 pc; • separate plastic wings - 6 pc; • underride guard plastic - 2 pc; • rear protective device with mudguard; • mudguards on rear wings - 2 pc; • tool box - 1 pc; • tray in a technological box for fuel gathering - 1pc; |
|
Optional equipment: |
|
|
Mesuring system: |
• pump with hydraulic drive BlackmerLGLD3E,360 l/min; • counter LC MA7-GX10, 280 l/min. with firler, air eliminator, dif. valve, primter; • hoose reel; • hoose DN32 - 30m; • nozzle REGO A7797A; |
|
Documents: |
• Export declaration • Transit number • Invoice - 5 pc • Other documents on request |
2. LPG Tank semi trailer photos
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |