Customization: | Available |
---|---|
After-sales Service: | Free Accessories |
Warranty: | 6-12 Months |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tare weight |
7000kg |
Size |
12500mm*2500mm*1550mm |
Payload |
50T |
Main beam |
Heavy duty and extra durability designed I beam; opting for high tensile steel Q345, |
Side beam |
No |
Cross member |
10# channel steel(Q235) |
Floor |
3mm checkered plate |
Side wall |
No |
Front board |
No |
Axle |
3 axle BPW/FUWA brand 13T |
Suspension |
Air suspension |
Tire |
12R22.5 double star brand 8pcs |
Wheel rim |
9.0-22.5 better brand 8pcs |
Kingpin |
JOST brand 2" /3.5'' bolt-in king pin |
Landing gear |
JOST brand two-speed, manual operating ,heavy duty landing gear 28T |
Twist lock |
8pcs |
Braking system |
WABCO RE6 relay valve ;T30/30 spring brake chamber;40L air tanks |
ABS |
Optional |
Lights |
LED 4 side lights and 2 rear lights 2 width lamp |
Painting |
Complete chassis sand blasting to clean rust ,1coat of anticorrosive prime,2coats of final paint |
Accessories |
One standard tool box,one spare tire carrier,one crank,one shaft headwrench,four side light,two rear light |
Date of delivery |
20 workdays after we received 30% of contract value T/T down payment. |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |