Customization: | Available |
---|---|
After-sales Service: | Has |
Warranty: | 6-12months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | SINOTRUK CDW 757 |
Engine | YC4D130-33, 4 cylinders in line, direct injection,turbo-charged and intercooler, Euro-2 emission standard, 130HP |
Cab | 1880 mm Extended Cabin,with A/C, Radio FM with USB Left hand drive cab |
Transmission | 10H46, 6 forwards & 1 reverse |
Steering | Power steering |
Number of axle | 2 |
Axle | 1090NG/8TD(i=6.833) |
Wheel base (mm) | 3350 |
Tires | 8.25-20×7, rear axle with double tires |
Overall dimension (mm) | 6150x2360x2670 mm |
Body dimension (mm) | 3800*2200*800 mm |
Lifting system | Single-plunger straight propping up |
Color | Red, Yellow, Green, White, Blue |
Model | SINOTRUK CDW 777 |
Engine | YC4D120-21, 4 cylinders in line, turbocharged, Euro 2 emission,120 Hp |
Cab | 1880 extended cabin, A/C, Radio FM with USB, full-covered interior trims Left hand drive cab |
Transmission | 10H46, 6 forwards & 1 reverse |
Steering | Power steering |
Number of axle | 2 |
Axle | CZ1092B/CZ1453D(i=6.833) |
Wheel base (mm) | 3350 |
Tires | 8.25R20×7, rear axle with double tires |
Overall dimension (mm) | 6050x2300x2670 mm |
Body dimension (mm) | 3800*2100*800 mm |
Lifting system | single plunger straight propping up hydraulic system φ180×440 mm |
Color | Red, Yellow, Green, White, Blue |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |