Customization: | Available |
---|---|
After-sales Service: | Has |
Warranty: | 6-12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Truck Specification | |||
Cab | HW76 Flat-top single row cab, with power steering. Electronic flameout, A/C | ||
Driving Type | 6x4Left hand driving | ||
Max Speed (km/h) | 90 | ||
Overall dimension(mm) | 9420×2500×3455 | ||
GVW( kg) | 25000 | ||
Mass in working order ( kg) | 13575 | ||
Wheelbase(mm) | 4625+1350 | ||
F/R track base (mm) | 2022/1830 | ||
F/R overhang (mm) | 1500/2380 | ||
Approach/Departure Angel | 16/14 | ||
Tire | 295/80R22.5 (10+1) | ||
Clutch | Single-plate dry diaphragm spring clutch | ||
Steering | Hydraulic steering with power assistance | ||
Gear box | 10-speed | ||
Bridge | Front axle | 7T | |
Rear axle | 13T+13T | ||
Enging | Model | WD615.69 | |
Fuel Type | Diesel fuel | ||
Type | Water-cooled six-stroke,, direct injection, turbocharged | ||
Exhaust(ml) | 9726 | ||
Max output power/rotate speed (hp /rpm ) | 336/2200 | ||
Max torque/rotate speed(N.m/rpm) | 1350/1100~1600 | ||
Braking system | Service Brake | Compressed air brake | |
Park Brake | Spring energy | ||
Auxiliary brake | engine exhaust brake | ||
Eletric system | 24v |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you. |