Customization: | Available |
---|---|
After-sales Service: | 24 Hour Hot Line |
Warranty: | One Year or 100000km Which Comes First |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
Type | 9cubic meters concrete /cement mixer truck |
Chassis model | ZZ1257N3847 |
Dimension | 9335×2496×3980mm |
Rated loading capacity | 11850kg |
Wheel base | 3800+1350mm |
Tire specification | 12.00-20(11pcs) |
Engine model | WD615.69(sino truck brand) |
Power | 336HP |
Emmission standard | Euro 2 |
Fuel material | Diesel |
Max speed | 90km/h |
Feeding speed | ≥3m3/min |
Output speed | ≥2m3/min |
Speed reducer | Import from italy |
Water box capacity | 300L |
8m3concrete mixer | Italy PV089 pump,MF089motor,6SP Gearbox,China 12R radiator |
9m3concrete mixer | Italy PV089 pump,MF089motor,TOP P68 Gearbox,China 12L radiator |
10m3concreter\ mixer | Italy PV089 pump,MF089motor,TOP P68 Gearbox,China 12L Radiator |
11-12m3concrete mixer | Italy PV089 pump,MF089motor,TOP P75 Gearbox,China 12L Radiator |
14m3 concrete mixer | Italy PVA090 pump,MF090motor,TOP P75R or P80 Gearbox,China 25L or 26L Radiator |
16m3 concrete mixer | Italy PVA090 pump,MF090motor,TOP P80 Gearbox,China 25L or 26L Radiator |
Mixer body material | 5mm or 6mm steel plate |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |