Customization: | Available |
---|---|
After-sales Service: | Free Accessories |
Warranty: | One Year or 100000km Which Comes First |
Still deciding? Get samples of US$ 10000/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tare Weight | 6900kg |
Payload | 45000kg |
Overall Length | 12490 mm |
Overall Width | 2480 mm |
Overall Height | 3750mm |
I beam &Chassis | Heavy duty and extra durability designed I beam; Opting for high tensile steel Q345B, welded by automatic Submerged-Arc processes. Top Flange 14mm,width 140mm; Middle Flange 6mm, height 500mm; Bottom Flange 16mm,width 140mm. |
Axle | 3 axle |
Brand Name:, Fuwa |
|
Suspension | Mechanical suspension |
Leaf Spring | 8-piece leaf spring |
Curtain Material | PVC, fitted with buckles |
Slide Chunnel | Aluminum alloy double slide Chunnel |
King Pin | JOST brand 2" Bolt-in King Pin |
Landing Gear | JOST brand Two-speed, manual operating, heavy duty landing gear |
Wheel Rim | 8.25-22.5 steel wheel rim, 13 pieces |
Tire | 11R22.5 tire with one spare tire, 13 pieces |
Spare Tire | One set of spare tire including a carrier |
Braking System | WABCO RE 6 relay valve; T30/30+T30 Spring brake chamber; 45L air tanks |
Painting | Complete Chassis sand blasting to clean rust, 1 coat of anticorrosive prime, 2 coats of final paint |
Accessories | One standard tool box |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |