Customization: | Available |
---|---|
After-sales Service: | 24h Online, Professional After-Sales Service Team |
Warranty: | 1 Year or 60, 000 Kilometers |
Still deciding? Get samples of US$ 15000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Chassis brand | Sinotruk | HOWO |
Driving cab | 3 seats, RHD, 4x2 | RHD |
Volume | 5000 liters | 2~50000L |
Medium | Diesel | gasoline, or other oil products |
Overall dimension | 6995*2300*2550mm | |
Refueling machine position | Side of truck | |
Engine | YN4102, 88kw, 95hp, turbocharged intercooled diesel engine | |
Wheelbase | 3800mm | |
Curb weight | 4795kg | |
Max speed | 90km/h | |
Emission standard | Euro 2 | |
Axle & wheel | 2 axles, 6 wheels, | |
Tire specification | 8.25-16, with one spare tire | |
Others | oi tube and oil tube cylinders, lights, electric circuit, rear ladder, side protect fence, air condition, power steering, top fence, manhole, warning side, logo,etc | Customized |
Safety accessories for dangerous goods chassis | ||
Exhaust pipe | Front set, under driving cab | |
Manhole | Euro standard manhole | |
Emergency cut off valve | Set | |
Top fence | Top protect fence | customized |
Brake | Air brake | |
Conductive electrostatic reel | Set | |
Static conductive towing belt | Set | |
Fire extinguisher | Set, two units | |
Tank test | X-ray detection,water pressure test |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you |