Customization: | Available |
---|---|
After-sales Service: | 24 Hour Hot Line |
Warranty: | One Year or 100000km Which Comes First |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product type | Cement tank semi trailer | |
Outside dimension | Length:9700mm-13000mm width:2500 mm height:3800mm |
|
Tare weight | About 7.9T | |
Wheelbase | 4930+1310+1310 | |
Loading capacity | 40m3-60m3 | |
Axle | 13T FUWA/BPW Brand | |
ABS system | Optional | |
Suspension | Mechanical suspension or Air suspension(China brand or BPW ) | |
Spring leaf | 10Layer 13mm, optional | |
Tires | 12 Pieces 1200R22.5-16PR | |
Steel rim | 12pieces 9.0 | |
King pin | Welding type or assembling type | |
Support legs | China brand 30 tons( Double speed) | |
Side beam | 16mm or 18mm channel steel (Material is Q235 steel) | |
Electrical System | 24V,7 wire harness | |
Tool box | One piece or optional | |
Painting | Compete Chassis sand blasting to clean rust, first coating of anticorrosive prime, second coating of final paint |
Minimum order quantity? |
MOQ is 1 unit. |
Production period? |
(Truck & trailer) Within 30-55 days since the moment we got your down payment. (Spare Parts) Within 7 days since the moment we got your down payment. Besides in large quantities or imported |
Payment term? |
TT: 100% T/T should be paid before delivery (Truck & trailer) 30% T/T as deposit, the balance should be paid before delivery. or L/C. (Spare Parts) large quantities: 50% T/T as deposit, the balance should be paid before delivery, Or LC,Western union |
Shipping? |
(Truck & trailer) by container or RoRo/Bulk shipment. (South America, Middle East, Africa, Oceania etc.) by road or railway.(Russia, Mongolia, Kazakhstan, Uzbekistan , Vietnam, Laos etc.) (Spare Parts) Air transportation, such as DHL, TNT, UPS, or Fedex. Large value or Large quantity of goods, by sea or LCL |
After payment |
We will prepare the goods as soon as the financial notice money arrives.(It takes about two days for the money to arrive, excluding the weekend). We will take photos for you to confirm before the delivery, and then delivery to you. |